Skip to content
SEC – Space Engineering Company

Water & Marine · Siwan River, Iraq

Hydrographic Survey & Bathymetric Mapping — Siwan River

Bathymetric survey and hydrographic mapping of the Siwan River, supporting riverbed analysis, waterway assessment and engineering planning, completed in one month.

Client
NMF
Location
Siwan River, Iraq
Duration
1 month
Status
Completed
On-site team
USV acquisitionNMF

Scope of Work

  • Bathymetric survey
  • Riverbed mapping
  • Depth measurements
  • Hydrographic data collection
  • Waterway assessment
  • Geospatial data processing

Project imagery

Click any image to enlarge. Technical deliverables are shown uncropped.

Planning a similar project?

Our team can scope a survey, GIS or monitoring programme for your site.